Forensic Delay Analysis

- Chamberz has provided comprehensive forensic delay analysis services using its expert planners and delay analyst to various large scale projects including complex infrastructure and oil & gas projects. Our professionals mainly conduct programme based delay analysis in Primavera, subject to the availability of such programme information, which otherwise would be conducted on factual basis.
- In conducting the delay analysis, our expert professionals would consider all the factual information available prior to selecting an appropriate delay analysis technique. In doing so we would consider all the programme related information such as contract baseline schedule (approved or disputed), periodic update schedules submitted, any re-baseline or recovery schedules available and as-built programme. A series of meetings and discussions either face-to-face or via video / audio conferencing would be conducted in order to understand the factual information and organise such information in chronological manner in order to establish relevant delay events and its supporting evidences. Further discussions would be held to fine tune the delay analysis programme in line with the actual construction sequence.
- Results are interpreted pursuant to the standard industry procedures & contractual provisions and presented in a report that would establish entitlement for extension of time and quantum (in this instance, length of time) of such entitlement.
Airport projects
- Provided comprehensive delay analysis to establish delays & disruptions and entitlement to the extension of time in a brownfield airport expansion and modernisation project in South Asia.
- Deployed senior planners to prepare extension of time claim documents for a major delay event using As-Planned As-Impacted analysis in Primavera for a REDAS Design & Build main contractor in a major infrastructure project in Singapore.
Commercial Building Projects
- Conducted forensic delay analysis, using ‘Windows Analysis’, in support of extension of of time claim arising of various delays in Mechanical, Electrical and Plumbing (MEP) works for a overall period of more than 5 years in a major office buildings project under a bespoke contract between the main contractor and the specialist subcontractor in the Kingdom of Saudi Arabia.
Industrial projects
- Prepared delay analysis using ‘as-planned vs as-impacted’ technique and extension of time claim document for submission to the statutory authority in a mega sewage treatment plant for a main contractor involving delays in commencement and execution in various trades and services.
Downstream Oil & Gas (Petrochemical)
- Provided forensic delay analysis services to an EPC contractor in a product warehouse package in a petrochemical complex comprising of multiple delays, disruptions and preventions caused beyond the control of the contractor.
Downstream Oil & Gas (Pipeline & Terminal)
- Provided forensic delay analysis services to an EPC contractor in a gas pipeline project in South Asia that involved delays in statutory clearances and unforeseen ground conditions.
- Provided claims consultancy and forensic delay analysis services to an oil storage terminal &pipeline project in South East Asia that involved separate but connected engineering, procurement and construction contract packages awarded to various entities in a group.
Energy (Power Distribution)
- Provided forensic delay analysis services to a main contractor in a project for supply and erection of transmission towers funded by ADB in South Asia